mesh.frothly.org

The neighborhood wired itself

Network health and shared know-how for the stewards of sixty-four community-owned mesh networks. No subscription fees, no data caps, and no one selling anyone’s traffic.

Try Newark, every offline node, every hub or N-0001.

64

Community networks

210,412

Residents connected

3,624/3,690

Nodes online

99.95%

Average uptime, 90 days

$0

Subscription fees

61 of 64 networks fully operational · as of Nov 2, 2026, 06:00 UTC

  • Degraded Grainline, Buffalo · since 2026-11-02 02:15 UTC

    Lake-effect snow

    Heavy lake-effect snow overnight. Four rooftop nodes are offline and two links are degraded while dishes are iced over. Stewards will clear them after sunrise.

  • Maintenance Fordline, Detroit · since 2026-11-02 05:00 UTC

    Scheduled hub replacement

    Planned overnight replacement of a Gantry H3 hub with an H5, midnight to 4:00 am local time. Rooftops served by the hub have been moved to neighboring hubs for the window.

  • Degraded Las Mareas, San Juan · since 2026-11-01 21:40 UTC

    Grid outage

    A grid outage since yesterday evening has left nine rooftop nodes without power. Hubs are running on solar and battery as designed, and the backbone is up.

Yesterday’s traffic

All sixty-four networks together, measured as the total passing through every node. Traffic peaks in the evening, when people are home.

Peak
173.6 Gbps at 9:00 pm ET
Quietest hour
26.2 Gbps at 4:00 am ET
Busiest network
Sheridan Flats, 5.1 Gbps at peak
050100150200 12 am6 am12 pm6 pm11 pm
Gigabits per second, November 1, 2026, Eastern time.

Recent maintenance

The latest entries from every network’s maintenance log.

  1. Gilpin Row · Power cut. The rooftop nodes on the affected blocks went down with the grid. Hubs stayed up on battery.

  2. Westhaven · N-0934 replaced under warranty after its radio stopped associating.

  3. Tannery Row · Planned backhaul work. Done overnight. Members were told a week ahead at the monthly assembly.

  4. Proctor Hollow · Annual assembly: 58 members attended and elected two stewards.

  5. Harborview · Power injector for N-3161 replaced after a surge.

  6. Lindenvale · Upstream outage. The network’s transit provider had an outage of its own. The mesh itself stayed up, and local services kept working.

  7. Ashgrove · Power cut. The rooftop nodes on the affected blocks went down with the grid. Hubs stayed up on battery.

  8. Sedgley Hollow · Upstream outage. The network’s transit provider had an outage of its own. The mesh itself stayed up, and local services kept working.