LT-41 · Tucson, AZ

Santa Cruz Bend

Santa Cruz Bend Mesh Cooperative. Switched on Nov 2, 2019; 893 households connected through 36 nodes.

About the network

Santa Cruz Bend covers about 22 blocks of Tucson’s near west side, mostly stucco bungalows and courtyard apartments. The network was built by a group of high school robotics students and their teacher after the incumbent provider declined, again, to upgrade the area’s copper lines.

Schematic

Schematic of the Santa Cruz Bend network 36 nodes: 2 hubs, 1 relay and 33 rooftop nodes. All are online. Backbone links join the hubs and relays, each rooftop links to its nearest hub, and 2 backhaul links leave the network. Positions are approximate and drawn on a lettered grid, not a map. Every node is listed in the table below. ABCDEFGH12345 BH1BH2 N-1746N-1828
Hub Relay Rooftop Backbone Access Backhaul Offline Degraded

Uptime

99.96% uptime over the last 90 days, with 1 day of degraded service or maintenance.

90 days agoToday

Governance

Owned by
Santa Cruz Bend Mesh Cooperative
Legal home
Cooperative corporation, owned by member households
Members
893 households, one vote each
Monthly assembly
Second Monday of each month, 7:00 pm, at the branch library’s community room
Annual assembly
Every September
Maintenance fund
$8 a month per household, suggested. No household is disconnected for not paying.

Stewards

Elected by the members. Listed by first name and initial.

  • Jamal C.Network steward · since 2022
  • Kwame K.Treasurer · since 2024
  • Maya C.Membership steward · since 2022
  • Maurice I.Training steward · since 2022

Backhaul

Links that carry the network’s traffic to the wider internet.

Backhaul links
LinkMediumCapacityFar endPeak use yesterday
LT-41-BH1 Fiber 10 Gbps Tucson internet exchange 13%
LT-41-BH2 Licensed microwave, 11 GHz 2 Gbps Tower site, Tucson 19%

Maintenance log

  1. Firmware 4.6.2 rollout. Staged firmware rollout to every node, one hub’s area at a time. Each node restarted once.

  2. Annual assembly: 66 members attended and elected two stewards.

  3. Planned backhaul work. Done overnight. Members were told a week ahead at the monthly assembly.

  4. Grounding on N-1828 redone after an inspection found a corroded lug.

  5. Hardware refresh: 15 nodes upgraded to Stoop R6 over the year.

  6. N-1759 replaced under warranty after its radio stopped associating.

  7. Annual assembly: 81 members attended and elected four stewards.

  8. Dish on N-2790 re-aimed after a neighbor’s new extension blocked the path.

  9. High winds: 3 rooftop mounts checked and re-secured.

  10. Climbing safety refresher: 21 installers recertified.

  11. Maintenance fund audit presented to members and approved.

  12. Steward training on monitoring and fault-finding: 12 attended.

  13. Hardware refresh: 13 nodes upgraded to Stoop R5 over the year.

  14. Firmware 4.0 rolled out to every node.

  15. Expansion: four new nodes in 2020, mostly in grids A1, B2 and E5.

  16. New hub on the parish bell tower: N-1828.

  17. Network switched on: 26 nodes installed by 89 volunteers over a weekend.

  18. Founding assembly: the Santa Cruz Bend Mesh Cooperative adopts its charter and elects four stewards.

36 nodes in Santa Cruz Bend, in the order they were installed.

Nodes in Santa Cruz Bend
NodeRoleSiteGridHardwareInstalledUptime, 30 daysStatus
N-1746 Hub Community health center roof G3 Gantry H5 2019-11-01 99.90% Online
N-1747 Relay Chimney mount B5 Span P3 2019-11-01 99.87% Online
N-1748 Rooftop Duplex B1 Stoop R5 2019-11-01 99.87% Online
N-1749 Rooftop Walk-up, three storeys H3 Stoop R6 2019-11-01 99.84% Online
N-1750 Rooftop Laundromat B1 Stoop R6 2019-11-01 99.84% Online
N-1751 Rooftop Rowhouse C1 Stoop R5 2019-11-01 99.85% Online
N-1752 Rooftop Garden apartment building H2 Stoop R6 2019-11-01 99.97% Online
N-1753 Rooftop Two-family house H3 Stoop R5 2019-11-01 99.91% Online
N-1754 Rooftop Garden apartment building A3 Stoop R4 2019-11-01 99.94% Online
N-1755 Rooftop Bungalow F2 Stoop R6 2019-11-01 99.81% Online
N-1756 Rooftop Walk-up, four storeys A3 Stoop R5 2019-11-01 99.92% Online
N-1757 Rooftop Triple-decker C2 Stoop R5 2019-11-01 99.80% Online
N-1758 Rooftop Barbershop E2 Stoop R5 2019-11-02 99.98% Online
N-1759 Rooftop Laundromat E4 Stoop R6 2019-11-02 99.80% Online
N-1760 Rooftop Church hall G2 Stoop R6 2019-11-02 99.94% Online
N-1761 Rooftop Barbershop G5 Stoop R6 2019-11-02 99.96% Online
N-1762 Rooftop Barbershop F2 Stoop R5 2019-11-02 99.98% Online
N-1763 Rooftop Church hall F5 Stoop R6 2019-11-02 99.89% Online
N-1764 Rooftop Rowhouse H5 Stoop R6 2019-11-02 99.92% Online
N-1765 Rooftop Laundromat B1 Stoop R6 2019-11-02 99.97% Online
N-1766 Rooftop Walk-up, four storeys G3 Stoop R6 2019-11-02 99.90% Online
N-1767 Rooftop Rowhouse F3 Stoop R6 2019-11-02 99.84% Online
N-1768 Rooftop Walk-up, three storeys G4 Stoop R4 2019-11-02 99.84% Online
N-1769 Rooftop Laundromat A2 Stoop R5 2019-11-02 99.91% Online
N-1770 Rooftop Triple-decker G1 Stoop R5 2019-11-02 99.89% Online
N-1771 Rooftop Two-family house A2 Stoop R5 2019-11-02 99.95% Online
N-1822 Rooftop Bungalow B2 Stoop R4 2020-03-19 99.80% Online
N-1828 Hub Parish bell tower A1 Gantry H5 2020-04-01 99.87% Online
N-1829 Rooftop Three-family house A1 Stoop R6 2020-04-02 99.86% Online
N-1911 Rooftop Bungalow E5 Stoop R6 2020-05-21 99.86% Online
N-2155 Rooftop Walk-up, three storeys F3 Stoop R5 2021-03-28 99.95% Online
N-2376 Rooftop Three-family house B2 Stoop R6 2021-12-16 99.88% Online
N-2399 Rooftop Two-family house B2 Stoop R5 2022-02-08 99.97% Online
N-2552 Rooftop Barbershop F4 Stoop R5 2022-07-22 99.81% Online
N-2790 Rooftop Two-family house B1 Stoop R5 2023-06-28 99.97% Online
N-3638 Rooftop Church hall B3 Stoop R6 2026-08-03 99.92% Online