Southbank covers about 42 blocks of Charleston’s northeast side, mostly shotgun houses and doubles. The network was built by the public library’s branch staff and its regulars after a provider’s fiber build stopped six blocks short of the neighborhood.
Schematic
Hover over or tap a node for its details, and click or tap again to open it. With a keyboard, move to the schematic and use the arrow keys.
Uptime
99.98% uptime over the last 90 days, with no days of degraded service or maintenance.
Governance
- Owned by
- Southbank Mesh Cooperative
- Legal home
- Nonprofit corporation with a member-elected board
- Members
- 1,051 households, one vote each
- Monthly assembly
- First Thursday of each month, 7:00 pm, at the recreation center
- Annual assembly
- Every January
- Maintenance fund
- $5 a month per household, suggested. No household is disconnected for not paying.
Stewards
Elected by the members. Listed by first name and initial.
- Maurice L.Network steward · since 2026
- Isaiah C.Treasurer · since 2026
- Desmond D.Membership steward · since 2024
- Lamar G.Training steward · since 2025
- Kwame R.Rooftops steward · since 2025
- Sunita F.Secretary · since 2024
Backhaul
Links that carry the network’s traffic to the wider internet.
| Link | Medium | Capacity | Far end | Peak use yesterday |
|---|---|---|---|---|
| LT-60-BH1 | Fiber | 10 Gbps | Charleston internet exchange | 20% |
Maintenance log
Firmware 4.6.2 rollout. Staged firmware rollout to every node, one hub’s area at a time. Each node restarted once.
Rooftop agreements reviewed; 4 renewed with new building owners.
N-3294 replaced under warranty after its radio stopped associating.
Expansion: eleven new nodes in 2026, mostly in grids A1, A3 and B2.
Annual assembly: 46 members attended and elected four stewards.
Hardware refresh: 5 nodes upgraded to Stoop R6 over the year.
Expansion: eight new nodes in 2025, mostly in grids A2, A3 and B2.
Mount on N-3147 re-secured after the host reported a loose mast.
Heat wave: 2 rooftop nodes throttled; all recovered overnight.
New hub on the community health center roof: N-3267.
Storm damage: 8 dishes realigned and one mast replaced.
Mount on N-3084 re-secured after the host reported a loose mast.
Steward training on monitoring and fault-finding: 16 attended.
Dish on N-3090 re-aimed after a neighbor’s new extension blocked the path.
Expansion: four new nodes in 2024, mostly in grids B2, D3 and F2.
Network switched on: 25 nodes installed by 155 volunteers over a weekend.
Founding assembly: the Southbank Mesh Cooperative adopts its charter and elects five stewards.