LT-57 · New Bedford, MA

Harborview

Harborview Community Network Cooperative. Switched on Jun 17, 2023; 865 households connected through 43 nodes.

About the network

Harborview covers about 31 blocks of New Bedford’s northeast side, mostly public housing towers and the walk-ups around them. The network was built by a parish youth group after the branch library cut its opening hours and its computer lab with them.

Schematic

Schematic of the Harborview network 43 nodes: 2 hubs, 1 relay, 35 rooftop nodes and 5 street nodes. 42 nodes online; N-2782 degraded. Backbone links join the hubs and relays, each rooftop links to its nearest hub, and 2 backhaul links leave the network. Positions are approximate and drawn on a lettered grid, not a map. Every node is listed in the table below. ABCDEFGH12345 BH1BH2 N-2768N-3156
Hub Relay Rooftop Street Backbone Access Backhaul Offline Degraded

Uptime

99.97% uptime over the last 90 days, with no days of degraded service or maintenance.

90 days agoToday

Governance

Owned by
Harborview Community Network Cooperative
Legal home
Community land trust program
Members
865 households, one vote each
Monthly assembly
Third Thursday of each month, 7:30 pm, at the union hall
Annual assembly
Every November
Maintenance fund
$4 a month per household, suggested. No household is disconnected for not paying.

Stewards

Elected by the members. Listed by first name and initial.

  • Víctor M.Network steward · since 2025
  • Joaquín R.Treasurer · since 2026
  • Tamika T.Membership steward · since 2024
  • Carmen G.Training steward · since 2025
  • Duc M.Rooftops steward · since 2024

Backhaul

Links that carry the network’s traffic to the wider internet.

Backhaul links
LinkMediumCapacityFar endPeak use yesterday
LT-57-BH1 Fiber 10 Gbps New Bedford internet exchange 13%
LT-57-BH2 Licensed microwave, 11 GHz 2 Gbps Tower site, New Bedford 19%

Maintenance log

  1. Power injector for N-3161 replaced after a surge.

  2. Firmware 4.6.2 rollout. Staged firmware rollout to every node, one hub’s area at a time. Each node restarted once.

  3. Expansion: five new nodes in 2026, mostly in grids A1, B1 and B3.

  4. Rooftop agreements reviewed; 6 renewed with new building owners.

  5. Annual assembly: 71 members attended and elected two stewards.

  6. Hardware refresh: 9 nodes upgraded to Stoop R6 over the year.

  7. Heavy rain: water ingress found and fixed in 5 enclosures.

  8. Installer workshop: 7 residents trained and climbed their first roof.

  9. Expansion: four new nodes in 2025, mostly in grids B1, G4 and G5.

  10. New hub on the former bank building roof: N-3156.

  11. Tree trimming along two backbone paths, with the city’s parks crew.

  12. Grounding on N-2817 redone after an inspection found a corroded lug.

  13. Expansion: eleven new nodes in 2024, mostly in grids A1, A2 and A3.

  14. Radio on N-2778 replaced after water got into the enclosure.

  15. Grounding on N-2783 redone after an inspection found a corroded lug.

  16. Expansion: three new nodes in 2023, mostly in grids C2, G4 and H5.

  17. Network switched on: 20 nodes installed by 131 volunteers over a weekend.

  18. Founding assembly: the Harborview Community Network Cooperative adopts its charter and elects five stewards.

43 nodes in Harborview, in the order they were installed.

Nodes in Harborview
NodeRoleSiteGridHardwareInstalledUptime, 30 daysStatus
N-2768 Hub Parish bell tower A1 Gantry H5 2023-06-16 99.84% Online
N-2769 Rooftop Duplex C2 Stoop R5 2023-06-16 99.98% Online
N-2770 Rooftop Rowhouse F3 Stoop R6 2023-06-16 99.96% Online
N-2771 Rooftop Garden apartment building H4 Stoop R5 2023-06-16 99.94% Online
N-2772 Rooftop Church hall A3 Stoop R5 2023-06-16 99.85% Online
N-2773 Rooftop Church hall C1 Stoop R5 2023-06-16 99.99% Online
N-2774 Rooftop Rowhouse B2 Stoop R5 2023-06-16 99.87% Online
N-2775 Rooftop Barbershop G3 Stoop R5 2023-06-16 99.97% Online
N-2776 Rooftop Laundromat F5 Stoop R5 2023-06-16 99.90% Online
N-2777 Rooftop Bungalow E5 Stoop R6 2023-06-16 99.99% Online
N-2778 Rooftop Walk-up, four storeys H3 Stoop R6 2023-06-16 99.89% Online
N-2779 Rooftop Walk-up, three storeys F4 Stoop R5 2023-06-16 99.90% Online
N-2780 Rooftop Church hall B1 Stoop R5 2023-06-16 99.87% Online
N-2781 Rooftop Triple-decker G3 Stoop R6 2023-06-16 99.89% Online
N-2782 Rooftop Barbershop A2 Stoop R5 2023-06-16 98.92% Degraded
N-2783 Rooftop Rowhouse C1 Stoop R5 2023-06-16 99.92% Online
N-2784 Relay Chimney mount E2 Span P3 2023-06-17 99.84% Online
N-2785 Rooftop Two-family house H5 Stoop R5 2023-06-17 99.91% Online
N-2786 Rooftop Church hall E4 Stoop R5 2023-06-17 99.81% Online
N-2787 Rooftop Rowhouse A3 Stoop R5 2023-06-17 99.99% Online
N-2817 Rooftop Two-family house H5 Stoop R5 2023-08-08 99.81% Online
N-2820 Rooftop Two-family house C2 Stoop R5 2023-08-13 99.96% Online
N-2887 Street Utility pole, under a city permit G4 Lamppost S2 2023-10-31 99.89% Online
N-2943 Rooftop Corner store C1 Stoop R6 2024-02-14 99.86% Online
N-2961 Rooftop Walk-up, four storeys A1 Stoop R6 2024-04-09 99.84% Online
N-3004 Rooftop Duplex G3 Stoop R6 2024-05-19 99.94% Online
N-3015 Rooftop Triple-decker E5 Stoop R6 2024-06-09 99.81% Online
N-3048 Street Utility pole, under a city permit A3 Lamppost S2 2024-08-09 99.83% Online
N-3062 Rooftop Laundromat C3 Stoop R6 2024-09-04 99.86% Online
N-3105 Street Utility pole, under a city permit A2 Lamppost S2 2024-10-16 99.96% Online
N-3120 Rooftop Barbershop A1 Stoop R6 2024-11-11 99.86% Online
N-3139 Rooftop Rowhouse G5 Stoop R6 2024-12-11 99.86% Online
N-3148 Street Utility pole, under a city permit F5 Lamppost S2 2024-12-20 99.88% Online
N-3153 Rooftop Church hall F4 Stoop R6 2024-12-28 99.96% Online
N-3156 Hub Former bank building roof G5 Gantry H5 2025-01-04 99.95% Online
N-3161 Rooftop Apartment building, six storeys H5 Stoop R6 2025-01-13 99.88% Online
N-3183 Rooftop Walk-up, four storeys B1 Stoop R6 2025-03-14 99.80% Online
N-3306 Rooftop Rowhouse G4 Stoop R6 2025-09-24 99.99% Online
N-3376 Rooftop Two-family house B1 Stoop R6 2026-02-14 99.88% Online
N-3391 Street Utility pole, under a city permit B3 Lamppost S2 2026-03-20 99.82% Online
N-3443 Rooftop Three-family house A1 Stoop R6 2026-05-06 99.94% Online
N-3631 Rooftop Three-family house C2 Stoop R6 2026-07-21 99.96% Online
N-3679 Rooftop Walk-up, four storeys B3 Stoop R6 2026-10-01 99.83% Online