Río Bajo covers about 31 blocks of El Paso’s near west side, mostly stucco bungalows and courtyard apartments. The network was built by parents from the local elementary school after a provider’s fiber build stopped six blocks short of the neighborhood.
Schematic
Hover over or tap a node for its details, and click or tap again to open it. With a keyboard, move to the schematic and use the arrow keys.
Uptime
99.89% uptime over the last 90 days, with 1 day of degraded service or maintenance.
Governance
- Owned by
- Río Bajo Neighborhood Network
- Legal home
- Cooperative corporation, owned by member households
- Members
- 1,258 households, one vote each
- Monthly assembly
- Third Monday of each month, 7:30 pm, at the housing cooperative’s lobby
- Annual assembly
- Every August
- Maintenance fund
- $9 a month per household, suggested. No household is disconnected for not paying.
Stewards
Elected by the members. Listed by first name and initial.
- Nikolai P.Network steward · since 2025
- José D.Treasurer · since 2024
- Ana D.Membership steward · since 2025
- Jorge K.Training steward · since 2023
Backhaul
Links that carry the network’s traffic to the wider internet.
| Link | Medium | Capacity | Far end | Peak use yesterday |
|---|---|---|---|---|
| LT-39-BH1 | Fiber | 10 Gbps | El Paso internet exchange | 15% |
| LT-39-BH2 | Licensed microwave, 11 GHz | 2 Gbps | Tower site, El Paso | 21% |
| LT-39-BH3 | Fiber, donated by the library system | 1 Gbps | Public library network | 21% |
Maintenance log
Firmware 4.6.2 rollout. Staged firmware rollout to every node, one hub’s area at a time. Each node restarted once.
Heat wave: 9 rooftop nodes throttled; all recovered overnight.
Annual assembly: 110 members attended and elected three stewards.
Backhaul fiber cut. A construction crew dug through the fiber. Traffic moved to the backup link at reduced speed until the provider spliced the cable.
Hardware refresh: 3 nodes upgraded to Gantry H5 over the year.
Storm damage: 7 dishes realigned and one mast replaced.
Hardware refresh: 16 nodes upgraded to Stoop R6 over the year.
Climbing safety refresher: 18 installers recertified.
Expansion: three new nodes in 2025, mostly in grids A4, D5 and G2.
Annual assembly: 78 members attended and elected two stewards.
Spare parts inventory counted and restocked.
Dish on N-1674 re-aimed after a neighbor’s new extension blocked the path.
New hub on the senior center roof: N-2884.
Expansion: six new nodes in 2023, mostly in grids A3, C5 and E2.
Rooftop agreements reviewed; 2 renewed with new building owners.
Power injector for N-1669 replaced after a surge.
Hardware refresh: 13 nodes upgraded to Stoop R5 over the year.
Expansion: seven new nodes in 2020, mostly in grids A5, B5 and C5.
Firmware 4.0 rolled out to every node.
Network switched on: 25 nodes installed by 61 volunteers over a weekend.
Founding assembly: the Río Bajo Neighborhood Network adopts its charter and elects four stewards.